METODE CLIMBING FORM DALAM PELAKSANAAN PEKERJAAN CORE WALL �STUDI KASUS PROYEK HOTEL QUEST SOLO� PT ADHI KARYA

The three main components that need to be planned carefully in concrete construction work, which is a mixture of concrete, concrete reinforcement, and formwork or formwork. All three of these components greatly influence the success of a job structure, including the structure of the core wall. The r...

全面介紹

Saved in:
書目詳細資料
Main Authors: , FARADINDA PRABANDINI, , Dian Sestining Ayu, ST., MT.
格式: Theses and Dissertations NonPeerReviewed
出版: [Yogyakarta] : Universitas Gadjah Mada 2014
主題:
ETD
在線閱讀:https://repository.ugm.ac.id/132961/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73506
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Universitas Gadjah Mada
實物特徵
總結:The three main components that need to be planned carefully in concrete construction work, which is a mixture of concrete, concrete reinforcement, and formwork or formwork. All three of these components greatly influence the success of a job structure, including the structure of the core wall. The rebarring analysis has an important function in the power structure. Selection of construction methods will also have a significant impact assessed in terms of an effective and efficient system that is used for completion of the work structure of the core wall. Because the core structure of the wall is a large vertical concrete structures and has a typical shape that required a special system in practice, using climbing formwork system. The system uses a Tower Crane lifting equipment in the process of core wall. In the cost analysis climbing form system to work on a building wall cores obtained 23 floor price that is more efficient than a system with slip form, has a price difference of Rp Rp 115.500.000,00. For climbing form system itself worth USD 109.754.014,00 while the slip systems form Rp 225.254.014,00. Although in terms of the number of workers more 2 and more time of 0.5 days, but the excess climbing system is much more efficient in terms of cost, so that the system is widely used in construction projects.