PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO DENGAN MENGGUNAKAN MICROSOFT PROJECT
Quest Hotel Solo is category of high rise building, it is height approximately 76.650 m or more of the requirements of high rise building that is 24 m, the number of floors with 22 floors and is equipped with a ballroom and swimming pool facilities. Implementation of this project using materials tha...
Saved in:
Main Authors: | , |
---|---|
格式: | Theses and Dissertations NonPeerReviewed |
出版: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
主題: | |
在線閱讀: | https://repository.ugm.ac.id/131889/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72399 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|