ANALISIS UNJUK KERJA DARI KOMPONEN � KOMPONEN UTAMA PEMBANGKIT LISTRIK TENAGA UAP (PLTU) DI TAMBANG BATU BARA, PT KALTIM PRIMA COAL (KPC)

Steam power plant that uses coal as fuel is widely used in Indonesia. This system uses the Rankine cycle which makes high-pressure steam as the primary energy source. With the increasing electricity consumption, the efficiency of the generation system needs to be improved. Analysis of performance of...

Full description

Saved in:
Bibliographic Details
Main Authors: , FAJAR BANGKIT PRASETYO, , Prof. Dr. Ir. Indarto, DEA.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/127402/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=67653
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada

Similar Items