KAJIAN DAMPAK PENDANAAN KARBON DALAM PEMBANGUNAN DAN OPERASIONAL PEMBANGKIT LISTRIK TENAGA UAP (PLTU) BERBAHAN BAKAR BATUBARA DENGAN TEKNOLOGI ULTRASUPERCRITICAL DI INDONESIA
Indonesia today facing the lack of electricity condition. Acceleration program to develop 35.000 MW of electricity implemented by government yields problems such as very large investment needs and an increase of carbon emission. PT. PLN (Persero) planned to built 1.000 MW coal power plant using Ultr...
Saved in:
主要作者: | |
---|---|
格式: | Theses |
語言: | Indonesia |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/64860 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|