KAJIAN DAMPAK PENDANAAN KARBON DALAM PEMBANGUNAN DAN OPERASIONAL PEMBANGKIT LISTRIK TENAGA UAP (PLTU) BERBAHAN BAKAR BATUBARA DENGAN TEKNOLOGI ULTRASUPERCRITICAL DI INDONESIA

Indonesia today facing the lack of electricity condition. Acceleration program to develop 35.000 MW of electricity implemented by government yields problems such as very large investment needs and an increase of carbon emission. PT. PLN (Persero) planned to built 1.000 MW coal power plant using Ultr...

全面介紹

Saved in:
書目詳細資料
主要作者: Restu Adiati, Ririn
格式: Theses
語言:Indonesia
在線閱讀:https://digilib.itb.ac.id/gdl/view/64860
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!