Minimizing total setup cost for a metal casting company
Proceedings - Winter Simulation Conference
Saved in:
Main Authors: | Yuan, X.-M., Khoo, H.H., Speeding, T.A., Bainbridge, I., Taplin, D.M.R. |
---|---|
其他作者: | CHEMICAL & BIOMOLECULAR ENGINEERING |
格式: | Conference or Workshop Item |
出版: |
2014
|
在線閱讀: | http://scholarbank.nus.edu.sg/handle/10635/90619 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | National University of Singapore |
相似書籍
-
Creating a green supply chain
由: Khoo, H.H., et al.
出版: (2014) -
Use of simulation and modelling to develop a sustainable production system
由: Taplin, D.M.R., et al.
出版: (2014) -
Use of simulation and modelling to develop a sustainable production system
由: Taplin, D.M.R., et al.
出版: (2014) -
Unsold versus unbought commitment : minimum total commitment contracts with nonzero setup costs
由: Yuan, Quan, et al.
出版: (2015) -
A scheduling heuristic for simultaneous minimization of makespan and total weighted tardiness in the open shop setup
由: Siy, Eric A.
出版: (1999)