Problems encountered at the interface between piling and substructure construction
This report examines the potential disputes and interface problems among piling, excavation and building contractors with implications on the current practice of contracts award in Singapore. Many factors are considered when problems are encountered, the common ones being time, cost and the possible...
Saved in:
主要作者: | |
---|---|
其他作者: | |
格式: | Theses and Dissertations |
語言: | English |
出版: |
2008
|
主題: | |
在線閱讀: | http://hdl.handle.net/10356/13086 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|