Full steam ahead: A history of the Tiwi geothermal power plant, 1962-2023
This study is about the history and development of the Tiwi Geothermal Power Plant. It creates a historical narrative of the Tiwi Geothermal Power Plant as an institution starting from the initial geothermal studies conducted in Tiwi, Albay in 1962 to its development in 1972; its operationalization...
محفوظ في:
المؤلف الرئيسي: | |
---|---|
التنسيق: | text |
اللغة: | English |
منشور في: |
Animo Repository
2024
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://animorepository.dlsu.edu.ph/etdb_history/33 https://animorepository.dlsu.edu.ph/context/etdb_history/article/1033/viewcontent/2024_Villanueva_Full_steam_ahead__A_history_of_the_Tiwi_Geothermal_Power_Plant_1.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|