Full steam ahead: A history of the Tiwi geothermal power plant, 1962-2023

This study is about the history and development of the Tiwi Geothermal Power Plant. It creates a historical narrative of the Tiwi Geothermal Power Plant as an institution starting from the initial geothermal studies conducted in Tiwi, Albay in 1962 to its development in 1972; its operationalization...

Full description

Saved in:
Bibliographic Details
Main Author: Villanueva, Arvi J.
Format: text
Language:English
Published: Animo Repository 2024
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etdb_history/33
https://animorepository.dlsu.edu.ph/context/etdb_history/article/1033/viewcontent/2024_Villanueva_Full_steam_ahead__A_history_of_the_Tiwi_Geothermal_Power_Plant_1.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!