EVALUASI JEMBATAN DAN SABO YANG DIFUNGSIKAN SEBAGAI JEMBATAN DI SUNGAI BOYONG YOGYAKARTA PASCA ERUPSI GUNUNG MERAPI 2010

Mount Merapi is one of 129 active volcanoes in Indonesia, which includes frequently erupt. On October 26, 2010 eruption of Mount Merapi have returned. This was the biggest disaster in comparison to similar disasters in the five previous time period ie 1994, 1997, 1998, 2001 and 2006. The continuing...

Full description

Saved in:
Bibliographic Details
Main Authors: , Mega Ayundya Widiastuti, , Prof. Ir. Iman Satyarno, M.E., Ph.D.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2012
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/98918/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=54723
Tags: Add Tag
No Tags, Be the first to tag this record!
id id-ugm-repo.98918
record_format dspace
spelling id-ugm-repo.989182016-03-04T08:47:46Z https://repository.ugm.ac.id/98918/ EVALUASI JEMBATAN DAN SABO YANG DIFUNGSIKAN SEBAGAI JEMBATAN DI SUNGAI BOYONG YOGYAKARTA PASCA ERUPSI GUNUNG MERAPI 2010 , Mega Ayundya Widiastuti , Prof. Ir. Iman Satyarno, M.E., Ph.D., ETD Mount Merapi is one of 129 active volcanoes in Indonesia, which includes frequently erupt. On October 26, 2010 eruption of Mount Merapi have returned. This was the biggest disaster in comparison to similar disasters in the five previous time period ie 1994, 1997, 1998, 2001 and 2006. The continuing impact of the eruption of Mount Merapi, debris flow, potentially damaging the buildings contained in the rivers that disgorge at Mount Merapi, such as bridge including sabo dam functioned as a bridge. It is therefore important to evaluate condition of existing bridges and sabo post-eruption of Mount Merapi. The limited funds provided by the Government in an effort to restore function and condition of the bridge in one groove is the cause of the need for preparation of the scale of priorities, in order to determine the bridge that must be repaired first. The research begins with the collection of primary and secondary data, then the data were analyzed by assessing the condition of the damage that occurs in the elements of bridge and oprit. Bridge condition assessment refers to the Bridge Management System standard, while for oprit refer to the draft Urgent Disaster Reduction Project for Mt. Merapi Operation and Maintenance for Facilities Sabo. Further evaluation andformulation of priorities and recommendations handling of the bridge and sabo dam The impact of Mt. Merapi eruption in 2010 to the bridge and sabo which is functioned as a bridge on the River Boyong are increases in riverbeds and damage to the retaining wall on the bridge, ie Ngentak, Plemburan, Boyong, and Gemawang bridge,while the sabo is abrasion on the surface layers of all sabo which is functioned as a bridge and buried several components downstream of main dam, ie the BO-C8A, BO-C11B, BO-C4A. In terms of structures stability, the entire bridge is located on the river Boyong still safe to pass, except Wonosobo bridge and Kemiri bridge. Priorities for the handling of the bridge is divided into classes bridges, respectively ie class A (on the national road), class B bridge (on the district / city road), class C (on rural roads). Priority handling of class A are Tungkak, Boyong, Sudirman, Code Bridge [Yogyakarta] : Universitas Gadjah Mada 2012 Thesis NonPeerReviewed , Mega Ayundya Widiastuti and , Prof. Ir. Iman Satyarno, M.E., Ph.D., (2012) EVALUASI JEMBATAN DAN SABO YANG DIFUNGSIKAN SEBAGAI JEMBATAN DI SUNGAI BOYONG YOGYAKARTA PASCA ERUPSI GUNUNG MERAPI 2010. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=54723
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, Mega Ayundya Widiastuti
, Prof. Ir. Iman Satyarno, M.E., Ph.D.,
EVALUASI JEMBATAN DAN SABO YANG DIFUNGSIKAN SEBAGAI JEMBATAN DI SUNGAI BOYONG YOGYAKARTA PASCA ERUPSI GUNUNG MERAPI 2010
description Mount Merapi is one of 129 active volcanoes in Indonesia, which includes frequently erupt. On October 26, 2010 eruption of Mount Merapi have returned. This was the biggest disaster in comparison to similar disasters in the five previous time period ie 1994, 1997, 1998, 2001 and 2006. The continuing impact of the eruption of Mount Merapi, debris flow, potentially damaging the buildings contained in the rivers that disgorge at Mount Merapi, such as bridge including sabo dam functioned as a bridge. It is therefore important to evaluate condition of existing bridges and sabo post-eruption of Mount Merapi. The limited funds provided by the Government in an effort to restore function and condition of the bridge in one groove is the cause of the need for preparation of the scale of priorities, in order to determine the bridge that must be repaired first. The research begins with the collection of primary and secondary data, then the data were analyzed by assessing the condition of the damage that occurs in the elements of bridge and oprit. Bridge condition assessment refers to the Bridge Management System standard, while for oprit refer to the draft Urgent Disaster Reduction Project for Mt. Merapi Operation and Maintenance for Facilities Sabo. Further evaluation andformulation of priorities and recommendations handling of the bridge and sabo dam The impact of Mt. Merapi eruption in 2010 to the bridge and sabo which is functioned as a bridge on the River Boyong are increases in riverbeds and damage to the retaining wall on the bridge, ie Ngentak, Plemburan, Boyong, and Gemawang bridge,while the sabo is abrasion on the surface layers of all sabo which is functioned as a bridge and buried several components downstream of main dam, ie the BO-C8A, BO-C11B, BO-C4A. In terms of structures stability, the entire bridge is located on the river Boyong still safe to pass, except Wonosobo bridge and Kemiri bridge. Priorities for the handling of the bridge is divided into classes bridges, respectively ie class A (on the national road), class B bridge (on the district / city road), class C (on rural roads). Priority handling of class A are Tungkak, Boyong, Sudirman, Code Bridge
format Theses and Dissertations
NonPeerReviewed
author , Mega Ayundya Widiastuti
, Prof. Ir. Iman Satyarno, M.E., Ph.D.,
author_facet , Mega Ayundya Widiastuti
, Prof. Ir. Iman Satyarno, M.E., Ph.D.,
author_sort , Mega Ayundya Widiastuti
title EVALUASI JEMBATAN DAN SABO YANG DIFUNGSIKAN SEBAGAI JEMBATAN DI SUNGAI BOYONG YOGYAKARTA PASCA ERUPSI GUNUNG MERAPI 2010
title_short EVALUASI JEMBATAN DAN SABO YANG DIFUNGSIKAN SEBAGAI JEMBATAN DI SUNGAI BOYONG YOGYAKARTA PASCA ERUPSI GUNUNG MERAPI 2010
title_full EVALUASI JEMBATAN DAN SABO YANG DIFUNGSIKAN SEBAGAI JEMBATAN DI SUNGAI BOYONG YOGYAKARTA PASCA ERUPSI GUNUNG MERAPI 2010
title_fullStr EVALUASI JEMBATAN DAN SABO YANG DIFUNGSIKAN SEBAGAI JEMBATAN DI SUNGAI BOYONG YOGYAKARTA PASCA ERUPSI GUNUNG MERAPI 2010
title_full_unstemmed EVALUASI JEMBATAN DAN SABO YANG DIFUNGSIKAN SEBAGAI JEMBATAN DI SUNGAI BOYONG YOGYAKARTA PASCA ERUPSI GUNUNG MERAPI 2010
title_sort evaluasi jembatan dan sabo yang difungsikan sebagai jembatan di sungai boyong yogyakarta pasca erupsi gunung merapi 2010
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2012
url https://repository.ugm.ac.id/98918/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=54723
_version_ 1681230447654207488