Analisis Makespan Job shop Menggunakan Metode Active, Non-Delay dan Heuristic Generation

This paper reports a proposed solution to the problem that commonly exists in the Job Shop industry which apply MOT system with varying type of repetitive product. Three algorithm scheduling methods have been used to look at a make span during production process i.e. Active Generation (AG), Non Dela...

全面介紹

Saved in:
書目詳細資料
主要作者: Perpustakaan UGM, i-lib
格式: Article NonPeerReviewed
出版: [Yogyakarta] : Universitas Gadjah Mada 2009
主題:
在線閱讀:https://repository.ugm.ac.id/27462/
http://i-lib.ugm.ac.id/jurnal/download.php?dataId=10521
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Universitas Gadjah Mada