Evaluasi Rencana Pengembangan Kolam Labuh Pelabuhan Pt Semen Gresik Di Tuban

Dredging-works for harbour basin maintenance is relatively costly. In order to reduce the dredging-works activities, evaluation on the design of the harbour basin for PT Semen Gresik Industry should be carried out carefully. Based on the wave data surrounding Tuban area, the location of the surf-zon...

全面介紹

Saved in:
書目詳細資料
主要作者: Perpustakaan UGM, i-lib
格式: Article NonPeerReviewed
出版: [Yogyakarta] : Fak. Biologi UGM 2000
主題:
在線閱讀:https://repository.ugm.ac.id/20201/
http://i-lib.ugm.ac.id/jurnal/download.php?dataId=3047
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
實物特徵
總結:Dredging-works for harbour basin maintenance is relatively costly. In order to reduce the dredging-works activities, evaluation on the design of the harbour basin for PT Semen Gresik Industry should be carried out carefully. Based on the wave data surrounding Tuban area, the location of the surf-zone and breaking zone can he distinguished and plotted in the bathymetric chart. Using this chart, it can be shown that the location of the harbour basin in the area of surf zone, and this mean that the harbour basin will be terribly silted. To reduce this siltation it is recommended to build under water sill surrounding the harbour basin or to relocate the jetty to the depth of -13,0 m.