ANALISIS KETERLAMBATAN PROYEK PEMBANGUNAN FLY OVER TAHAP 1, SIMPANG JAKABARING PALEMBANG
Project management is a critical factor in the implementation of a construction project. As a process, project management has the sequence / phase of the project. Starting from the stage of identification, preparation, planning, implementation and evaluation. On the flyover project Simpang Jakabarin...
Saved in:
主要作者: | APRILIA, NYIMAS ARNITA |
---|---|
格式: | Theses and Dissertations NonPeerReviewed |
出版: |
[Yogyakarta] : Universitas Gadjah Mada
2015
|
主題: | |
在線閱讀: | https://repository.ugm.ac.id/134766/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=77863 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Universitas Gadjah Mada |
相似書籍
-
Indonesia Air Traffic Services (ATS) Readiness and Strategic Plans for Taking Over Airspace and Improving the Service (Case Study : Airspace Sector A,B,and C)
由: MANGKO, Ade Patra
出版: (2013) -
ROAD SAFETY PERCEPTION TOWARDS SUSTAINABLE TRANSPORT: A Case of Road Safety Programs in Yogyakarta, Indonesia
由: NURHIDAYATI, ZUNI ASIH
出版: (2015) -
A MODELLING STUDY OF GLOBAL MARITIME FREIGHT DEMAND FORECASTING
由: SOU WENG SUT
出版: (2016) -
AVIATION SECURITY SERVICE ENHANCEMENT THROUGH VALUE CO-CREATION AT NGURAH RAI AIRPORT BALI
由: KUNTOROJATI, WIDI
出版: (2013) -
Adopsi Teknologi E-Ticketing dalam Mendukung Persaingan Bisnis dengan Model Tam pada Lingkungan Perusahaan Penerbangan di Indonesia : Kasus pada PT Airasia Indonesia
由: SEYA, Adhec Visca
出版: (2013)