ASPEK HUKUM TERHADAP PEJABAT PEMBUAT AKTA TANAH SEMENTARA YANG DILAKUKAN OLEH CAMAT DI DALAM WILAYAH KERJANYA
This study aims to determine the implementation of the Land Deed Official Position While that is done by sub district head in the working area and to determine the duties and authority of the Land Deed Official Meanwhile conducted by the sub district heads in the working area. The nature of research...
Saved in:
Main Authors: | , |
---|---|
格式: | Theses and Dissertations NonPeerReviewed |
出版: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
主題: | |
在線閱讀: | https://repository.ugm.ac.id/134424/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=76881 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
總結: | This study aims to determine the implementation of the Land Deed
Official Position While that is done by sub district head in the working area and to determine
the duties and authority of the Land Deed Official Meanwhile conducted by the sub district
heads in the working area.
The nature of research used in this research is research normative law, where research
law normative is that research done by means of researching material pustaka or data
secondary.All the data been obtained from research, next analyzed in a qualitative
juridical.Research it starts with determine beforehand existing in exercise of authority subdistrict
as officials pembua certificate meanwhile, the ground then make draft of trouble and
title.Next gathering materials laws relating to the main issues and memilahnya according to the
so ease in doing analysis
Based on the result of the study, could be noticed that in running his term of office as an
official a maker of deed of the ground while sub-district it must necessarily hold it firm staple a
tenure by which implemented in accordance with the regulations. Any sub district, should be
seized control of the and is expected to increase of knowledge, and education either through
education remains as well as trainings in the field of defence to at least reduce problem and
reduce the problems that will arise.
Key word : PPAT Sementara, Camat, the sub working area |
---|