PENGEMBANGAN MODEL PENGELOLAAN SISTEM PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO YANG BERKELANJUTAN Studi Kasus PLTMH Kedungrong Desa Purwoharjo Kecamatan Samigaluh Kabupaten Kulon Progo Provinsi DI Yogyakarta
Yogyakarta Province until 2014 has built a total of 10 (ten) micro hydropower plants (MHP). However, from these ten MHPs, there is only 1 (one) which is still in operation, namely Kedungrong Micro Hydropower Plant. This Kedungrong Micro Hydropower Plant was selected as the research area due to its s...
Saved in:
Main Authors: | , ASPITA DYAH F, , Muhammad Sulaiman, S.T., M.T., D.Eng. |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/133909/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=74810 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Pengaruh stratigrafi lereng dan sifat mekanika tanah pada gerakan tanah di Dusun Kedungrong, Desa Purwoharjo, Kecamatan Samigaluh, Kabupaten Kulon Progo, Propinsi daerah Istimewa Yogyakarta
by: , PERMANAJATI, Indra, et al.
Published: (2004) -
STUDI PEMANFAATAN POTENSI ALIRAN SUNGAI CI MANDALAWANGI, KAB. SUKABUMI UNTUK PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH).
by: Setia Nugraha, Hari -
DESAIN TURBIN ULIR DENGAN MATERIAL BAMBU
UNTUK PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH)
DENGAN MEMANFAATKAN TENAGA AIR
SALURAN IRIGASI
by: , SUKIJO, Drs, et al.
Published: (2011) -
POTENSI SUMBERDAYA PEMBANGKIT LISTRIK TENAGA MIKRO-HIDRO
(PLTMH) SUNGAI KIKIM GUNA MEMENUHI KEBUTUHAN LISTRIK DESA
LUBUK TUBA DALAM, KABUPATEN LAHAT PROVINSI SUMATERA SELATAN
by: Manik, Samuel
Published: (2018) -
Evaluasi dan optimasi sistim mitigasi bencana tanah longsor di desa Purwoharjo Kecamatan Samigaluh Kabupaten Kulon Progo
by: , WELLIANG, Sardjon, et al.
Published: (2003)