Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun
Dimethylformamide manufacturing process takes place in the flow stirred tank reactor. The reaction takes place in the gas phase with a temperature of 60ºC and a pressure of 5 atm. Due to the exothermic reaction of running, water used as a coolant. The need for water utilities include as much 55.056...
Saved in:
Main Authors: | , |
---|---|
格式: | Theses and Dissertations NonPeerReviewed |
出版: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
主題: | |
在線閱讀: | https://repository.ugm.ac.id/133062/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73613 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Universitas Gadjah Mada |