Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun
Dimethylformamide manufacturing process takes place in the flow stirred tank reactor. The reaction takes place in the gas phase with a temperature of 60ºC and a pressure of 5 atm. Due to the exothermic reaction of running, water used as a coolant. The need for water utilities include as much 55.056...
Saved in:
Main Authors: | , |
---|---|
格式: | Theses and Dissertations NonPeerReviewed |
出版: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
主題: | |
在線閱讀: | https://repository.ugm.ac.id/133062/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73613 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
id |
id-ugm-repo.133062 |
---|---|
record_format |
dspace |
spelling |
id-ugm-repo.1330622016-03-04T07:58:12Z https://repository.ugm.ac.id/133062/ Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun , LARS STARNER REGEN , Prof.Ir.Arief Budiman,M.S.,D.Eng ETD Dimethylformamide manufacturing process takes place in the flow stirred tank reactor. The reaction takes place in the gas phase with a temperature of 60ºC and a pressure of 5 atm. Due to the exothermic reaction of running, water used as a coolant. The need for water utilities include as much 55.056 m3 / hour derived from the river around Karawang,, steam as much as 7695.0 Kg / h generated by the boiler. The utilities also needs 7211 Litre of fuel oil / hour and 11676,9 kg/hour of compressed air . Dimetilformamide plant with a capacity of 75,000 tonnes / year will be established in Karawang, West Java, with a land area of 30 hectares and 200 employees. Fixed capital investment of $ 13,142,270.86 + Rp 69,182,944,000 , workingcapital of $ 576.277.44 + Rp 316 172 757 000 , ROI before taxes 39.97 % , and 23.98 % ROI after tax while the POT is a 2,001 -year pre-tax and after tax 2,943 years . Break even point 48.90 % , 32.20 % shut down point . In terms of the economy and the need for the establishment of Dimetilformamid factory in Indonesia , the plant with a capacity of 75,000 tonnes per year is quite exciting to be reexamined to set up in Indonesia . [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , LARS STARNER REGEN and , Prof.Ir.Arief Budiman,M.S.,D.Eng (2014) Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73613 |
institution |
Universitas Gadjah Mada |
building |
UGM Library |
country |
Indonesia |
collection |
Repository Civitas UGM |
topic |
ETD |
spellingShingle |
ETD , LARS STARNER REGEN , Prof.Ir.Arief Budiman,M.S.,D.Eng Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun |
description |
Dimethylformamide manufacturing process takes place in the flow stirred
tank reactor. The reaction takes place in the gas phase with a temperature of 60ºC and
a pressure of 5 atm. Due to the exothermic reaction of running, water used as a
coolant.
The need for water utilities include as much 55.056 m3 / hour derived from
the river around Karawang,, steam as much as 7695.0 Kg / h generated by the boiler.
The utilities also needs 7211 Litre of fuel oil / hour and 11676,9 kg/hour of
compressed air .
Dimetilformamide plant with a capacity of 75,000 tonnes / year will be
established in Karawang, West Java, with a land area of 30 hectares and 200
employees.
Fixed capital investment of $ 13,142,270.86 + Rp 69,182,944,000 ,
workingcapital of $ 576.277.44 + Rp 316 172 757 000 , ROI before taxes 39.97 % ,
and 23.98 % ROI after tax while the POT is a 2,001 -year pre-tax and after tax 2,943
years . Break even point 48.90 % , 32.20 % shut down point . In terms of the
economy and the need for the establishment of Dimetilformamid factory in Indonesia
, the plant with a capacity of 75,000 tonnes per year is quite exciting to be reexamined
to set up in Indonesia . |
format |
Theses and Dissertations NonPeerReviewed |
author |
, LARS STARNER REGEN , Prof.Ir.Arief Budiman,M.S.,D.Eng |
author_facet |
, LARS STARNER REGEN , Prof.Ir.Arief Budiman,M.S.,D.Eng |
author_sort |
, LARS STARNER REGEN |
title |
Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun |
title_short |
Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun |
title_full |
Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun |
title_fullStr |
Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun |
title_full_unstemmed |
Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun |
title_sort |
prarancangan pabrik dimetil formamid dari metil formiat dan dimetil amin kapasitas 75000 ton/tahun |
publisher |
[Yogyakarta] : Universitas Gadjah Mada |
publishDate |
2014 |
url |
https://repository.ugm.ac.id/133062/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73613 |
_version_ |
1681233615393914880 |