Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun

Dimethylformamide manufacturing process takes place in the flow stirred tank reactor. The reaction takes place in the gas phase with a temperature of 60ºC and a pressure of 5 atm. Due to the exothermic reaction of running, water used as a coolant. The need for water utilities include as much 55.056...

全面介紹

Saved in:
書目詳細資料
Main Authors: , LARS STARNER REGEN, , Prof.Ir.Arief Budiman,M.S.,D.Eng
格式: Theses and Dissertations NonPeerReviewed
出版: [Yogyakarta] : Universitas Gadjah Mada 2014
主題:
ETD
在線閱讀:https://repository.ugm.ac.id/133062/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73613
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
id id-ugm-repo.133062
record_format dspace
spelling id-ugm-repo.1330622016-03-04T07:58:12Z https://repository.ugm.ac.id/133062/ Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun , LARS STARNER REGEN , Prof.Ir.Arief Budiman,M.S.,D.Eng ETD Dimethylformamide manufacturing process takes place in the flow stirred tank reactor. The reaction takes place in the gas phase with a temperature of 60ºC and a pressure of 5 atm. Due to the exothermic reaction of running, water used as a coolant. The need for water utilities include as much 55.056 m3 / hour derived from the river around Karawang,, steam as much as 7695.0 Kg / h generated by the boiler. The utilities also needs 7211 Litre of fuel oil / hour and 11676,9 kg/hour of compressed air . Dimetilformamide plant with a capacity of 75,000 tonnes / year will be established in Karawang, West Java, with a land area of 30 hectares and 200 employees. Fixed capital investment of $ 13,142,270.86 + Rp 69,182,944,000 , workingcapital of $ 576.277.44 + Rp 316 172 757 000 , ROI before taxes 39.97 % , and 23.98 % ROI after tax while the POT is a 2,001 -year pre-tax and after tax 2,943 years . Break even point 48.90 % , 32.20 % shut down point . In terms of the economy and the need for the establishment of Dimetilformamid factory in Indonesia , the plant with a capacity of 75,000 tonnes per year is quite exciting to be reexamined to set up in Indonesia . [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , LARS STARNER REGEN and , Prof.Ir.Arief Budiman,M.S.,D.Eng (2014) Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73613
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, LARS STARNER REGEN
, Prof.Ir.Arief Budiman,M.S.,D.Eng
Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun
description Dimethylformamide manufacturing process takes place in the flow stirred tank reactor. The reaction takes place in the gas phase with a temperature of 60ºC and a pressure of 5 atm. Due to the exothermic reaction of running, water used as a coolant. The need for water utilities include as much 55.056 m3 / hour derived from the river around Karawang,, steam as much as 7695.0 Kg / h generated by the boiler. The utilities also needs 7211 Litre of fuel oil / hour and 11676,9 kg/hour of compressed air . Dimetilformamide plant with a capacity of 75,000 tonnes / year will be established in Karawang, West Java, with a land area of 30 hectares and 200 employees. Fixed capital investment of $ 13,142,270.86 + Rp 69,182,944,000 , workingcapital of $ 576.277.44 + Rp 316 172 757 000 , ROI before taxes 39.97 % , and 23.98 % ROI after tax while the POT is a 2,001 -year pre-tax and after tax 2,943 years . Break even point 48.90 % , 32.20 % shut down point . In terms of the economy and the need for the establishment of Dimetilformamid factory in Indonesia , the plant with a capacity of 75,000 tonnes per year is quite exciting to be reexamined to set up in Indonesia .
format Theses and Dissertations
NonPeerReviewed
author , LARS STARNER REGEN
, Prof.Ir.Arief Budiman,M.S.,D.Eng
author_facet , LARS STARNER REGEN
, Prof.Ir.Arief Budiman,M.S.,D.Eng
author_sort , LARS STARNER REGEN
title Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun
title_short Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun
title_full Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun
title_fullStr Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun
title_full_unstemmed Prarancangan Pabrik Dimetil Formamid dari Metil Formiat dan Dimetil Amin Kapasitas 75000 Ton/Tahun
title_sort prarancangan pabrik dimetil formamid dari metil formiat dan dimetil amin kapasitas 75000 ton/tahun
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2014
url https://repository.ugm.ac.id/133062/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73613
_version_ 1681233615393914880