PEMBUATAN PERANGKAT LUNAK SIMULASI HIDROGRAF INFLOW WADUK WONOGIRI PERIODE BANJIR

Wonogiri Reservoir is one of flood control building in the upper stream of Bengawan Solo River. Spillway gate operation during flood will perform well if it is supported by an integrated information system - inflow flood hydrograph estimation, reservoir flood routing, and impact of operation to the...

Full description

Saved in:
Bibliographic Details
Main Authors: , ANANTRI SULISTYOWATI, , Dr. Ir. Rachmad Jayadi, M. Eng.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/133056/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73607
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada