DESAIN ULANG TEBAL LAPIS PERKERASAN LENTUR RUAS JALAN MAGELANG � YOGYAKARTA DENGAN MENGGUNAKAN PEDOMAN PERENCANAAN PERKERASAN TAHUN 2002
Magelang � Yogyakarta road is a kind of Province Road that connecting Magelang city in Central Java Province and Yogyakarta city in Special District of Yogyakarta Province. This road ever had a problem with the increasing level of traffic activity in 2010 because of the eruption of Merapi Mountain...
محفوظ في:
المؤلفون الرئيسيون: | , |
---|---|
التنسيق: | Theses and Dissertations NonPeerReviewed |
منشور في: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://repository.ugm.ac.id/132964/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73509 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
المؤسسة: | Universitas Gadjah Mada |
الملخص: | Magelang â�� Yogyakarta road is a kind of Province Road that connecting
Magelang city in Central Java Province and Yogyakarta city in Special District of
Yogyakarta Province. This road ever had a problem with the increasing level of
traffic activity in 2010 because of the eruption of Merapi Mountain that makes a
lot of big truck comes to bring material from the Merapi Mountain.
The designing of overlay using metode analisis komponen 1987 has
already done and shows a big number of the width for the flexible pavement
which means that the result is not effective. This analysis tried to redesigning the
pavement road with the pavement design manual 2002 and comparing this two
result.
The result of calculation using pavement design manual 2002 shows a
thinner width for the pavement layer, where the value of surface course is 14 cm
and the width of base course is 25 cm with the capacity of traffic for 10 years is
35 � 106. Whereas the calculation using metode analisis komponen 1987 shows
the width of surface course is 18 cm, the width of base course is 15 cm and the
width of subbase course is 35 cm. The thinner result for the pavement layer also
makes the cost for pavement construction cheaper. |
---|