PELAKSANAAN MAGANG PEMBANGUNAN PROYEK GEDUNG KANTOR PT. MITRAIS
In the construction of office buildings PT.MITRAIS there are many items of work. Each job has a different difficulty level, so to deal with these difficulties in any work the contractor has a team of experts. A team of experts in charge of determining the method implementation to be used to conform...
محفوظ في:
المؤلفون الرئيسيون: | , |
---|---|
التنسيق: | Theses and Dissertations NonPeerReviewed |
منشور في: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://repository.ugm.ac.id/132669/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73210 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
الملخص: | In the construction of office buildings PT.MITRAIS there are many
items of work. Each job has a different difficulty level, so to deal with these
difficulties in any work the contractor has a team of experts. A team of experts
in charge of determining the method implementation to be used to conform to
the standards set. As the author had experience in collaboration with a team of
experts in the building project.
The preparation of the report describes each job is done with jobs in the
field and then do an analysis of the data obtained with the existing standards.
Data were obtained from direct observations in the field works, interviews, and
direct practices. In data analysis, the literature is used to strengthen the study
results obtained.
In this report, the author discusses and analyzes the implementation of
constructing PT.MITRAIS building. This study could be a reference in
implementation of the construction of another building that has the
specifications and conditions of the same land. |
---|