METODE PELAKSANAAN JEMBATAN UNDERPASS KERETA API BEBEKAN DAN ANALISA KAPASITAS DUKUNG TIANG DENGAN METODE SPT PROYEK PEMBANGUNAN JALAN TOL SURABAYA-MOJOKERTO SEKSI IB
Bridges as a means of transport has an important role for the smooth movement of traffic. The bridge is a construction that is pointless to continue the path that was interrupted due to barriers such as rivers, swamps, other roads, railroads. The reason the construction of the Surabaya-Mojokerto tol...
Saved in:
Main Authors: | , LILIK FAJAR P, , Dian Sestining Ayu, ST., MT. |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/132527/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73062 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
QUALITY CONTROL DAN METODE KERJA INTEGRAL BRIDGE SECTION P53-P87 PROYEK PEMBANGUNAN JALAN TOL SURABAYA - MOJOKERTO SEKSI IB
by: , ANDITHASARI P., et al.
Published: (2014) -
PENGENDALIAN MUTU DENGAN METODE Q-PASS PEMBANGUNAN JALAN TOL SURABAYA-MOJOKERTO (SEKSI I-B)
by: , IWAN SETYO WIBISONO, et al.
Published: (2014) -
EVALUASI FAKTOR KEAMANAN TERHADAP KAPASITAS DUKUNG FONDASI TIANG BOR, JEMBATAN KALI PUTIH BARU, MUNTILAN, KABUPATEN MAGELANG
by: , WAHYUDINUR HIDAYAT, et al.
Published: (2013) -
TAHANAN DUKUNG UJUNG PADA TIANG BOR PANJANG DAN TIANG BOR PENDEK
by: Suhendra Nugraha, Andrias -
PERANCANGAN SEKSI 4 KM 34 TOL CISUMDAWU
by: Noorkala Madani, Alamsyah