PELAKSANAAN STRUKTUR PADA PROYEK APARTEMENT SKYLAND CITY JATINANGOR DENGAN METODE KONVENSIONAL DI PT. PP (Persero)Tbk.

A long with the developments property in Indonesian , the role of a construction services become very important in the progress of a city, especially the area Jatinangor. Skyland City apartment development Jatinangor Education Park (JEP) to exist in the area of education that is surrounded by severa...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلفون الرئيسيون: , RODDY M BARINGBING, , Dian Sestining Ayu, ST., MT.
التنسيق: Theses and Dissertations NonPeerReviewed
منشور في: [Yogyakarta] : Universitas Gadjah Mada 2014
الموضوعات:
ETD
الوصول للمادة أونلاين:https://repository.ugm.ac.id/132437/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72971
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
المؤسسة: Universitas Gadjah Mada
الوصف
الملخص:A long with the developments property in Indonesian , the role of a construction services become very important in the progress of a city, especially the area Jatinangor. Skyland City apartment development Jatinangor Education Park (JEP) to exist in the area of education that is surrounded by several well-known public and private universities. Among these ITB, IPDN, UNPAD, and IKOPIN. Method of implementation structure at Skyland City apartment building project needs careful monitoring, for the smoothness of implementation of, effectiveness, and quality product. This prompted the authors to choose a topic of discussion in this report. Topic of this discussion focuses on methods of implementation structure. The purpose of this report is to determine the method of implementation of the project structure apaertement Skyland city. The elements are: (1) Material specifications regarding quality, (2) begesting about the way the process, (3) reinforcement of the deposit and the way the process, (4) the implementation of casting. Final report is expected to be useful for students who are discussing the same thing, which will carry out the same project. After observation in mind there are some implementation issues that arise and result in less efficient at work, namely: (1) barriers to natural factors, namely rain, which requires the workers to stop work for a while to wait until the rain stopped,, (3) the beam begesting one side of the edge does not hold the load of liquid concrete causing the concrete sagged,, (4) Printing beams are less dense that water causes a mixture of ready mix cement out of the mold that will lead to reduced quality of concrete. From the discussion, we can conclude / recommended: (1) should always be held coordination between all parties involved in the work carried out so that the work can proceed smoothly, (2) In the execution of the work should be done properly in accordance with a predetermined calculation and according to the proper way so that the least possible error that we get the job. Data was collected by means of: direct observation to the field, in consultation with the supervising field related to development projects apaertement Skyland city, conduct interviews with workers, foremen, contractors and consultants on the project site. Keywords: Structure and methods of implementation, Concreting, monitoring