METODE PELAKSANAAN PEKERJAAN CORE WALL PT. PEMBANGUNAN PROYEK APARTEMEN SKYLAND CITY ROSE IN SPRING JATINANGOR PP (PERSERO) Tbk. - CABANG IV
In the process, there are so many methods to maintain the stability of high rise buildings especially in resisting the lateral loads that have sigfinicant effects on it. Several systems are introduced to maintain the stability og high rise building including a shear wall structure and core wall. The...
محفوظ في:
المؤلفون الرئيسيون: | , |
---|---|
التنسيق: | Theses and Dissertations NonPeerReviewed |
منشور في: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://repository.ugm.ac.id/132400/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72933 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
المؤسسة: | Universitas Gadjah Mada |
الملخص: | In the process, there are so many methods to maintain the stability of high
rise buildings especially in resisting the lateral loads that have sigfinicant effects on
it. Several systems are introduced to maintain the stability og high rise building
including a shear wall structure and core wall. The core wall itself is a linear
supporting wall system fits enough for high rise buildings in which have a fixed
needs of functionality and utilities. The aims of final task writing are to find out
about the work phase of the core wall implementation, to know the formwork
method used in the implementation of the core wall�s works and also to understand
the problems in the implementation process of the work.
In practice, there are several stages in core wall�s work. Among of them are
measurement jobs, scaffolding jobs, iron fabrication, formwork jobs, formwork
inspections, concrete quality check, casting the core wall and dismantling the
formwork. The formwork method used is the climbing method.
Based on the information above, it can be concluded that the core wall has
some advantages and disadvantages. Therefore, in the execution of the core wall�s
works still need further inspection on each job carefully. |
---|