KARAKTERISASI GENERATOR SINKRON MODIFIKASI 3 FASA 220 V 600 RPM DENGAN EKSITASI SENDIRI

The enormous natural resources in Indonesia are greatly potential to be utilized as energy sources in power plants, specifically on countryside without PLN electric network to fulfill the self-electric needs. One example of the application is a Pico Hydro Power Plant. The principal component of it i...

全面介紹

Saved in:
書目詳細資料
Main Authors: , FARIZ HIDAYAT, , Dr.-Ing. Sihana
格式: Theses and Dissertations NonPeerReviewed
出版: [Yogyakarta] : Universitas Gadjah Mada 2014
主題:
ETD
在線閱讀:https://repository.ugm.ac.id/132339/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72868
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Universitas Gadjah Mada