EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV

Every process of building structure, especially in pouring process, therefore needs to repaired. Based on these problems it is necessary to check the postscasting concrete. Similarly, the Quest Hotel Solo project which is under the structure of the work. It aims to assess the results of casting to t...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلفون الرئيسيون: , ANANDA APRILIA SUKOR, , Edi Kurniadi, ST.,MT.
التنسيق: Theses and Dissertations NonPeerReviewed
منشور في: [Yogyakarta] : Universitas Gadjah Mada 2014
الموضوعات:
ETD
الوصول للمادة أونلاين:https://repository.ugm.ac.id/132179/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72699
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
المؤسسة: Universitas Gadjah Mada
id id-ugm-repo.132179
record_format dspace
spelling id-ugm-repo.1321792016-03-04T07:52:04Z https://repository.ugm.ac.id/132179/ EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV , ANANDA APRILIA SUKOR , Edi Kurniadi, ST.,MT. ETD Every process of building structure, especially in pouring process, therefore needs to repaired. Based on these problems it is necessary to check the postscasting concrete. Similarly, the Quest Hotel Solo project which is under the structure of the work. It aims to assess the results of casting to the planning standards to get quality concrete quality according to plan. In this project used concrete K-300 with slump value of 12 ± 2 cm. The evaluation process uses a method of Non-Conformance Report (NCR), which reports the discrepancies the failure to meet the requirements of casting concrete results. visual concrete evaluation, judged by physical form concrete form work when unloaded. Based on the evaluation during the study, the results of casting concrete which fulfill the requirements or not there is a defect, will be continued on the next job. While the results were classified as non conformance (NC) as porous, less average casting results, there is dirt and so forth, then the evaluation carried out for improvement. NC porous column is a common postcasting, so that part of the loss must be done immediately filling with cement paste to get better quality results. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , ANANDA APRILIA SUKOR and , Edi Kurniadi, ST.,MT. (2014) EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72699
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, ANANDA APRILIA SUKOR
, Edi Kurniadi, ST.,MT.
EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV
description Every process of building structure, especially in pouring process, therefore needs to repaired. Based on these problems it is necessary to check the postscasting concrete. Similarly, the Quest Hotel Solo project which is under the structure of the work. It aims to assess the results of casting to the planning standards to get quality concrete quality according to plan. In this project used concrete K-300 with slump value of 12 ± 2 cm. The evaluation process uses a method of Non-Conformance Report (NCR), which reports the discrepancies the failure to meet the requirements of casting concrete results. visual concrete evaluation, judged by physical form concrete form work when unloaded. Based on the evaluation during the study, the results of casting concrete which fulfill the requirements or not there is a defect, will be continued on the next job. While the results were classified as non conformance (NC) as porous, less average casting results, there is dirt and so forth, then the evaluation carried out for improvement. NC porous column is a common postcasting, so that part of the loss must be done immediately filling with cement paste to get better quality results.
format Theses and Dissertations
NonPeerReviewed
author , ANANDA APRILIA SUKOR
, Edi Kurniadi, ST.,MT.
author_facet , ANANDA APRILIA SUKOR
, Edi Kurniadi, ST.,MT.
author_sort , ANANDA APRILIA SUKOR
title EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV
title_short EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV
title_full EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV
title_fullStr EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV
title_full_unstemmed EVALUASI BETON PASCA PENGECORAN PADA PROYEK PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA (PERSERO) Tbk. � DIVISI KONSTRUKSI IV
title_sort evaluasi beton pasca pengecoran pada proyek pembangunan quest hotel solo pt. adhi karya (persero) tbk. � divisi konstruksi iv
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2014
url https://repository.ugm.ac.id/132179/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72699
_version_ 1681233456252583936