DESAIN RUTE PEMASANGAN KABEL LAUT JALUR TRANSMISI 150 KV ANTARA LANDING POINT KARIANGAU-PENAJAM
Electric power is needed for the community for various purposes. The electricity needs are increasing along with the development of community life. To a dress this issue, the construction of steam power plant (PLTU) in Port Kariangau, which will supply power through submarine cable in Balikpapan Bay...
Saved in:
Main Authors: | , DHANI ADITYA, , Bilal Ma�ruf, S.T., M.T |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/132018/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72534 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Pengaruh kabel bawah tanah 150 kV yang terhubung ke Gardu Induk Gejayan dalam keadaan sambaran petir
by: , ZULKARNAEN, Muhammad Fauzi, et al.
Published: (2010) -
Jalur Transmisi Akustik
by: Perpustakaan UGM, i-lib
Published: (1999) -
Pengurangan Rugi-rugi daya pada saluran transmisi 150 kV di wilayah D.I. Yogyakarta dengan menggunakan kapasitor Shunt
by: , HASBULLAH, et al.
Published: (2005) -
Pengaruh saluran kabel tegangan tinggi (SKTT) pada unjuk kerja sistem tenaga listrik :: Studi kasus sistem Jawa-Bali sub sistem 150 kV area III
by: , MULJONO, Agung Budi, et al.
Published: (2000) -
PERENCANAAN JALUR KABEL LISTRIK BAWAH LAUT ANTARA BANGUNAN LEPAS PANTAI
by: Chairunnisa, Putia