DESAIN RUTE PEMASANGAN KABEL LAUT JALUR TRANSMISI 150 KV ANTARA LANDING POINT KARIANGAU-PENAJAM
Electric power is needed for the community for various purposes. The electricity needs are increasing along with the development of community life. To a dress this issue, the construction of steam power plant (PLTU) in Port Kariangau, which will supply power through submarine cable in Balikpapan Bay...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/132018/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72534 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |