METODE PELAKSANAAN INTEGRAL BRIDGE PADA PROYEK PEMBANGUNAN JALAN TOL SURABAYA-MOJOKERTO (SECTION P1-P25 PADA Sta 11+190 � 11+440)
Integral bridge is a bridge structure that created the segment and made without any movement between spans or between spans the abutments thus behave like a continuous structure. Bridge integral System consist of full integral and semi integral. Integral Bridge with spans less than 20 metre to The c...
Saved in:
Main Authors: | , AZIZUR RAHMAN, , Dr. Eng. Iman Haryanto, MT. |
---|---|
格式: | Theses and Dissertations NonPeerReviewed |
出版: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
主題: | |
在線閱讀: | https://repository.ugm.ac.id/131883/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72393 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
QUALITY CONTROL DAN METODE KERJA INTEGRAL BRIDGE SECTION P53-P87 PROYEK PEMBANGUNAN JALAN TOL SURABAYA - MOJOKERTO SEKSI IB
由: , ANDITHASARI P., et al.
出版: (2014) -
Strategi pelaksanaan proyek pembangunan jalan tol pada lahan yang belum bebas :: Studi kasus pada kontraktor di proyek jalan tol Cinere Jagorawi Jakarta dan proyek jalan tol Waru Juanda Surabaya
由: , INDRARTO, Dono, et al.
出版: (2009) -
The human DENN gene: Genomic organization, alternative splicing, and localization to chromosome 11p11.21-p11.22
由: Chow, V.T.K., et al.
出版: (2016) -
ALTERNATIVE DESIGN FOR GLADAK MAINROAD BRIDGE (STA 11+395) YOGYAKARTA-BAWEN TOLL ROAD SECTION 5 USING BALANCED CANTILEVER METHOD
由: Revansyah Musa Marbun, Aditya -
Hidrolisis redroksimetilfenitoin dan asetoiloksimetilfenttoin pada berbagai p11
由: Perpustakaan UGM, i-lib
出版: (1993)