PERANCANGAN TURBIN PEMBANGKIT DAYA TENAGA SURYA TERMAL 250 KW
The demand of electrical power increases constantly each year. Because of energy resources is limited, it is necessary to look up for the other renewable energies, such as geothermal, solar power plant, and solar thermal power plant. A few area in Indonesia have potential resources to be used as sol...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/129383/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=69774 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|