ANALISIS KINERJA EJEKTOR UNTUK EKSTRAKSI UAP KONDENSER UTAMA PADA PLTP 25 MW PT GEO DIPA ENERGI Ltd. DIENG
Geothermal energy conversioninto electricityatGeoDipa Energy Ltd Dieng power plant use steam from the earth to rotating the turbine.Steam produced in PLTP GeoDipa EnergyLtd. Dieng�s wells has wet characteristic. So it, needs to separatethe vapor phase from mixed phaseon theseparator. Steamproduced...
Saved in:
Main Authors: | , |
---|---|
格式: | Theses and Dissertations NonPeerReviewed |
出版: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
主題: | |
在線閱讀: | https://repository.ugm.ac.id/124379/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=64500 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|