SIMULATION MODEL FOT POST-MINING PIT LAKE INFILLING AT PT XYZ'S MINING PIT

PT XYZ is a copper and gold mining company in Indonesia that will begin postmining activities in 2030. Currently, the company is facing challenges in planning the filling of the mine pit, which is estimated to hold 1,383,703,158 m³ of water at the spillway elevation of 260 mRL. The company’s targ...

Full description

Saved in:
Bibliographic Details
Main Author: Syahrani, Mega
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/86391
Tags: Add Tag
No Tags, Be the first to tag this record!