INCREASING OVERBURDEN PRODUCTIVITY ACHIEVEMENT BY USING LEAN SIX SIGMA FRAMEWORK: A CASE STUDY OF MINING ACTIVITY AT PT. BETA BY CONTRACTOR PT. DELTA
PT. DELTA, as one of the contractors engaged in mining activities at PT. BETA, has exhibited suboptimal overburden production performance over the past year. During the last one-year period (January 2023 to December 2023), PT. DELTA's overburden production performance is often below the plan (t...
Saved in:
主要作者: | |
---|---|
格式: | Theses |
語言: | Indonesia |
主題: | |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/80724 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Institut Teknologi Bandung |
語言: | Indonesia |