SIMULATION OF CAPACITY AND REQUIREMENTS OF DROP STRUCTURE ONMULTIBENCH OVERBURDEN DUMP
Mining activity is the process of extracting mineral resources from the earth. One of the outcomes of this mining activity is overburden rocks that will be stacked in an open area. The consequence of placing overburden rocks in an open area is their direct interaction with rainwater. The rainwate...
Saved in:
主要作者: | |
---|---|
格式: | Final Project |
語言: | Indonesia |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/78457 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Institut Teknologi Bandung |
語言: | Indonesia |