EVALUATION OF TARGET PRODUCTION ATTAINMENT FOR HEAVY EQUIPMENT UTILIZING QUEUEING THEORY IN OVERBURDEN REMOVAL AT PIT B PT XYZ
PT XYZ is one of the coal mining companies in Indonesia which is a supplier of coal for PLTU needs. The applied mining system is an open pit mining system using a combination of a backhoe as a digging tool and a dump truck as a means of conveyance. One of the important activities in open pit mini...
Saved in:
主要作者: | Tri Hartati, Linda |
---|---|
格式: | Final Project |
語言: | Indonesia |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/76834 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Institut Teknologi Bandung |
語言: | Indonesia |
相似書籍
-
OPTIMIZATION MODEL FOR SELECTING LOADING AND HAULING EQUIPMENT IN OVERBURDEN REMOVAL ACTIVITIES AT PIT PS PT. XYZ
由: Ramdhani, Bintang -
STUDI KARAKTERISASI GEOKIMIA SAMPEL OVERBURDEN TAMBANG BATUBARA PT. XYZ PADA PIT K
由: Muhammad D, Farhan -
OPTIMIZATION OF OVERBURDEN DISTRIBUTION USING LINEAR PROGRAMMING AT GRASBERG OPEN PIT
由: MAHAYASA (NIM : 29107134); Pembimbing: Ir. Rudy Bekti, MM, MADE -
STUDI KARAKTERISASI GEOKIMIA SAMPEL OVERBURDEN DI PIT GM PT. B
由: Farhan Muzzammil, M -
SYSTEM DYNAMIC MODELING FOR ANALYZING FUEL RATIO OF OVERBURDEN TRUCK IN PIT INUL LIGNIT PT. KALTIM PRIMA COAL
由: Rusmawati, Yulia