ANALISA MATERIAL BALANCE UNTUK SUMUR GAS MENGGUNAKAN DATA TEKANAN ALIR DASAR SUMUR

The P/z method has been widely used in determining in place in gas reservoir. This method requires reservoir pressures after shutting the well. After production, shutting the well is really avoided because the well can be off when it wants to be produced again. Because of that, the data are not ofte...

全面介紹

Saved in:
書目詳細資料
主要作者: Priatmojo M, Sandro
格式: Final Project
語言:Indonesia
主題:
在線閱讀:https://digilib.itb.ac.id/gdl/view/64322
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!