OPTIMASI PRODUKSI RESERVOIR GAS KERING X DENGAN PENURUNAN TEKANAN INLET KOMPRESOR UNTUK PEMENUHAN KONTRAK GAS

Reservoir X is a dry gas reservoir, situated in Y Field, which has been produced for seven years. It has been produced through three development wells; however, due to well integrity problem, there is only two wells left that can be produced as of now. In this study, a gas contract will be made usi...

全面介紹

Saved in:
書目詳細資料
主要作者: Prasetyoadi Susilo, Dwinanda
格式: Final Project
語言:Indonesia
主題:
在線閱讀:https://digilib.itb.ac.id/gdl/view/64153
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Institut Teknologi Bandung
語言: Indonesia
id id-itb.:64153
spelling id-itb.:641532022-04-01T13:09:58ZOPTIMASI PRODUKSI RESERVOIR GAS KERING X DENGAN PENURUNAN TEKANAN INLET KOMPRESOR UNTUK PEMENUHAN KONTRAK GAS Prasetyoadi Susilo, Dwinanda Pertambangan dan operasi berkaitan Indonesia Final Project dry gas, contract, production optimization INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/64153 Reservoir X is a dry gas reservoir, situated in Y Field, which has been produced for seven years. It has been produced through three development wells; however, due to well integrity problem, there is only two wells left that can be produced as of now. In this study, a gas contract will be made using two production of said two wells, pointing to the remaining reserves. Material balance P/Z method will be used to determine Initial Gas In Place (IGIP) with production and pressure data from the development wells. Production optimization of the two wells will be conducted by choosing producing well which gives the best development scenario. Integrated modelling of the reservoir system, wells, and pipe network using MBAL, GAP and PROSPER software from Petroleum Experts is conducted for this study. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Pertambangan dan operasi berkaitan
spellingShingle Pertambangan dan operasi berkaitan
Prasetyoadi Susilo, Dwinanda
OPTIMASI PRODUKSI RESERVOIR GAS KERING X DENGAN PENURUNAN TEKANAN INLET KOMPRESOR UNTUK PEMENUHAN KONTRAK GAS
description Reservoir X is a dry gas reservoir, situated in Y Field, which has been produced for seven years. It has been produced through three development wells; however, due to well integrity problem, there is only two wells left that can be produced as of now. In this study, a gas contract will be made using two production of said two wells, pointing to the remaining reserves. Material balance P/Z method will be used to determine Initial Gas In Place (IGIP) with production and pressure data from the development wells. Production optimization of the two wells will be conducted by choosing producing well which gives the best development scenario. Integrated modelling of the reservoir system, wells, and pipe network using MBAL, GAP and PROSPER software from Petroleum Experts is conducted for this study.
format Final Project
author Prasetyoadi Susilo, Dwinanda
author_facet Prasetyoadi Susilo, Dwinanda
author_sort Prasetyoadi Susilo, Dwinanda
title OPTIMASI PRODUKSI RESERVOIR GAS KERING X DENGAN PENURUNAN TEKANAN INLET KOMPRESOR UNTUK PEMENUHAN KONTRAK GAS
title_short OPTIMASI PRODUKSI RESERVOIR GAS KERING X DENGAN PENURUNAN TEKANAN INLET KOMPRESOR UNTUK PEMENUHAN KONTRAK GAS
title_full OPTIMASI PRODUKSI RESERVOIR GAS KERING X DENGAN PENURUNAN TEKANAN INLET KOMPRESOR UNTUK PEMENUHAN KONTRAK GAS
title_fullStr OPTIMASI PRODUKSI RESERVOIR GAS KERING X DENGAN PENURUNAN TEKANAN INLET KOMPRESOR UNTUK PEMENUHAN KONTRAK GAS
title_full_unstemmed OPTIMASI PRODUKSI RESERVOIR GAS KERING X DENGAN PENURUNAN TEKANAN INLET KOMPRESOR UNTUK PEMENUHAN KONTRAK GAS
title_sort optimasi produksi reservoir gas kering x dengan penurunan tekanan inlet kompresor untuk pemenuhan kontrak gas
url https://digilib.itb.ac.id/gdl/view/64153
_version_ 1823647426406252544