SQUEEZING PHENOMENON HANDLING ON WATER TUNNEL AT MANIKIN DAM IN KUPANG BY USING FOREPOLING

Squeezing phenomemon handling is needed in overcoming the problem of the squeezing phenomenon that occurs on the water tunnel wall at the Manikin Dam with methods that can be applied, one of which is by forepoling which includes the pre-support method. Forepoling is applied in the form of a mater...

全面介紹

Saved in:
書目詳細資料
主要作者: Stephen
格式: Final Project
語言:Indonesia
在線閱讀:https://digilib.itb.ac.id/gdl/view/56997
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Institut Teknologi Bandung
語言: Indonesia
實物特徵
總結:Squeezing phenomemon handling is needed in overcoming the problem of the squeezing phenomenon that occurs on the water tunnel wall at the Manikin Dam with methods that can be applied, one of which is by forepoling which includes the pre-support method. Forepoling is applied in the form of a material that envelops the tunnel. In this study, forepoling modeling was carried out with two models, namely roof forepoling and modification of the second model, namely roof-sidewall forepoling. In addition, in order to increase the effectiveness of squeezing handling with forepoling, further modifications were made by adding a 0.5 meter thick concrete lining. The results of the analysis show that there is a decrease in the total displacement value in the application of squeezing handling with the forepoling roof method, and the roof-support forepoling method when compared to the initial conditions. In handling with roof forepolling, at E values of 230 MPa, 100 MPa, and 80 MPa, the displacement decreased to 14.8 cm, 28.4 cm and 33.5 cm. Then by handling the roof-sidewall forepoling, with E values of 230 MPa, 100 MPa, and 80 MPa, the displacement decreased to 12.6 cm, 24.6 cm, and 29.1 cm. Then with the addition of a 0.5 meter thick concrete lining, with E values of 230 MPa, 100 MPa, and 80 MPa, the displacement decreased to 10.6 cm, 19 cm, and 24 cm. Therefore, the most effective squeezing handling method is the use of a roofsidewall forepoling model added with the application of concrete lining in an effort to resist the deformation that occurs in the Manikin Dam water tunnel.