WELL OPTIMIZATION ON XA-2 AND XA-S INTEGRATED WITH THE SURFACE AND SUBSURFACE IN THE X GAS FIELD

X gas field producing gas from retrograde gas reservoir, has less than 15 years remaining contract to be completed with rate constraints. Three years from now, plateau rate has to be reached at 61 MMSCFD for whole field and after that rate over 15 MMSCFD as an economic limit has to be reached. Mater...

全面介紹

Saved in:
書目詳細資料
主要作者: WAHYUDI (NIM : 22209061), AGUS
格式: Theses
語言:Indonesia
在線閱讀:https://digilib.itb.ac.id/gdl/view/19836
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Institut Teknologi Bandung
語言: Indonesia