Production Optimization Through Surface Facilities Modification in Condensate Gas Field
Gas field X has been producing since August 1990 and this field is considered as a giant wet gas field with potential reserve initial gas in place is around 15 TCF (trillion cubic feet). This field consists of production wells that have pipeline network which transports production fluid from product...
محفوظ في:
المؤلف الرئيسي: | |
---|---|
التنسيق: | Final Project |
اللغة: | Indonesia |
الوصول للمادة أونلاين: | https://digilib.itb.ac.id/gdl/view/11347 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|