A Comparison of Stochastic Scheduling Rules for Maximising Project Net Present Value
This paper examines the use of stochastic scheduling rules for maximizing the net present value of a project. A comprehensive set of 1440 test problems, representing five different project characteristics, is constructed. These test problems are used to evaluate the performance of nine stochastic sc...
Saved in:
Main Authors: | Yang, Kum Khiong, Tay, L C, Sum, C. C. |
---|---|
格式: | text |
語言: | English |
出版: |
Institutional Knowledge at Singapore Management University
1995
|
主題: | |
在線閱讀: | https://ink.library.smu.edu.sg/lkcsb_research/2225 https://doi.org/10.1016/0377-2217(94)00039-f |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
A comparison of stochastic scheduling rules for maximizing project net present value
由: Yang, K.K., et al.
出版: (2013) -
Sampling schedule design towards optimal drug monitoring for individualizing therapy
由: Ji, S., et al.
出版: (2016) -
An Evaluation of Due Date, Resource Allocation, Project Release and Activity Scheduling Rules in a Multi-Project Environment
由: Yang, Kum Khiong, et al.
出版: (1997) -
Scheduling a Project to Maximise Its Net Present Value: An Integer Programming Approach
由: Yang, Kum Khiong, et al.
出版: (1993) -
JIT scheduling rules: A simulation evaluation
由: Hum, S.-H., et al.
出版: (2013)