APA Citation

Gan, P., Lee, K., Zhang, Y., & ENGINEERING, M. (2014). A branch and bound algorithm based process-planning system for plastic injection mould bases.

Chicago Style Citation

Gan, P.Y., K.S Lee, Y.F Zhang, and MECHANICAL ENGINEERING. A Branch and Bound Algorithm Based Process-planning System for Plastic Injection Mould Bases. 2014.

MLA Citation

Gan, P.Y., K.S Lee, Y.F Zhang, and MECHANICAL ENGINEERING. A Branch and Bound Algorithm Based Process-planning System for Plastic Injection Mould Bases. 2014.

Warning: These citations may not always be 100% accurate.