Analisis perbaikan sistem Material Requirement Planning (MRP) dari periode bulanan menjadi periode mingguan di PT Sara Lee Bodycare Indonesia Tbk
Saved in:
Main Authors: | , RAHDIAN, Tito, , Adi Djoko Guritno, Dr.,Ir.,MSIE |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2007
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/74412/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=35277 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Similar Items
-
Analisis penerapan SAP-APO (advanced planning and optimization) sebagai upaya perbaikan perencanaan produksi di PT Sara Lee Bodycare Indonesia Tbk
by: , BUDIANA, Didi, et al.
Published: (2009) -
Analisis periode data harian, mingguan dan bulanan dalam pembentukan portofolio optimal
by: , SIAHAAN, Andreas, et al.
Published: (2005) -
Corporate strategy of House of Sara Lee: A Division of Sara Lee Phils., Inc., a Sara Lee/D.E. Company
by: Jamias, Ma. Louella G.
Published: (1996) -
Strategi perbaikan supply service level Sara Lee center of excellent Jakarta
by: , TAUFAN, Muhammad, et al.
Published: (2008) -
Manuscript for internship in Sara Lee Philippines
by: Mateo, Paula
Published: (2010)