Optimasi Operasi Embung Banyudono di Kabupaten Magetan Propinsi Jawa Timu
Embung Banyudono was constructed for irrigation purpose, especially for supplying water during the dry season. Due to the small capacity of the storage and the use of pumps to supply irrigation demand, the reservoir capability is limited. Storage resource potency has not been utilized optimally beca...
Saved in:
Main Authors: | , , |
---|---|
格式: | Article PeerReviewed |
語言: | English |
出版: |
Jurusan Teknik Sipil, Fakultas Teknik , UGM
2006
|
主題: | |
在線閱讀: | https://repository.ugm.ac.id/35105/1/Jurnal_forum_ts_agustus_2006.pdf https://repository.ugm.ac.id/35105/ |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|