ANALISIS KETERLAMBATAN PROYEK PEMBANGUNAN FLY OVER TAHAP 1, SIMPANG JAKABARING PALEMBANG
Project management is a critical factor in the implementation of a construction project. As a process, project management has the sequence / phase of the project. Starting from the stage of identification, preparation, planning, implementation and evaluation. On the flyover project Simpang Jakabarin...
Saved in:
Main Author: | APRILIA, NYIMAS ARNITA |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2015
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/134766/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=77863 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Similar Items
-
Indonesia Air Traffic Services (ATS) Readiness and Strategic Plans for Taking Over Airspace and Improving the Service (Case Study : Airspace Sector A,B,and C)
by: MANGKO, Ade Patra
Published: (2013) -
ROAD SAFETY PERCEPTION TOWARDS SUSTAINABLE TRANSPORT: A Case of Road Safety Programs in Yogyakarta, Indonesia
by: NURHIDAYATI, ZUNI ASIH
Published: (2015) -
A MODELLING STUDY OF GLOBAL MARITIME FREIGHT DEMAND FORECASTING
by: SOU WENG SUT
Published: (2016) -
AVIATION SECURITY SERVICE ENHANCEMENT THROUGH VALUE CO-CREATION AT NGURAH RAI AIRPORT BALI
by: KUNTOROJATI, WIDI
Published: (2013) -
Adopsi Teknologi E-Ticketing dalam Mendukung Persaingan Bisnis dengan Model Tam pada Lingkungan Perusahaan Penerbangan di Indonesia : Kasus pada PT Airasia Indonesia
by: SEYA, Adhec Visca
Published: (2013)