EVALUASI PEMBOROSAN PADA PROSES PRODUKSI MINUMAN TEH HIJAU APEL MENGGUNAKAN PENDEKATAN VALUE STREAM MAPPING (VSM) (Studi di PT. Regan Indonesia, Banguntapan, Bantul, Yogyakarta)
In the production process, waste can occur as a result of processes that do not add value. This kind of waste led to inefficient use of resources, increasing production costs and decreasing productivity. In order to enhance corporate competitiveness, PT Regan Indonesia seeking to reduce the waste th...
Saved in:
Main Authors: | , |
---|---|
格式: | Theses and Dissertations NonPeerReviewed |
出版: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
主題: | |
在線閱讀: | https://repository.ugm.ac.id/132843/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73388 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
總結: | In the production process, waste can occur as a result of processes that do not add
value. This kind of waste led to inefficient use of resources, increasing production
costs and decreasing productivity. In order to enhance corporate competitiveness, PT
Regan Indonesia seeking to reduce the waste that existed throughout the production
process. This study aims to identify waste in the production process, to assess the
level of waste, determine the level of waste that requires action, and develop
improvement efforts to reduce the waste. Identification and analysis of waste is done
with the approach of value stream mapping, and its assessment is done by means of
risk rating according to AS/NZS 4360: 2004. The results show the presence of waste
in the form of defective products, and unnecessary supplies that go into the extreme
level of risk that requires immediate corrective action. Improvement efforts to reduce
both waste is done by reducing the delay allowance cardboard packaging operator,
rearrange the layout of the production area, running machines at the proper speed and
capacity, and add one operator in filling and packaging station. Process Cycle
Efficiency value of the production process on the initial state map is 32.40%, while
the improvement using future state map give a values of 35.68%. |
---|