Evaluasi dan Optimasi Ukuran Komponen Penyusun Pembangkit Listrik Tenaga Hibrid Sistem Inovasi Daerah Pantai Baru
Rising demand for electricity and fossil fuel will deplete fossil fuel reservoir, therefore proper solution by the government to overcome the problem through the utilization of new and renewable energy is required. The Hybrid Power System Regional Innovation in Pantai Baru is an implementation of ne...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/132667/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73208 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Rising demand for electricity and fossil fuel will deplete fossil fuel reservoir,
therefore proper solution by the government to overcome the problem through the
utilization of new and renewable energy is required. The Hybrid Power System
Regional Innovation in Pantai Baru is an implementation of new and renewable
energy hybrid power system which is partnership among the government, the private
sector, the universities, and the surrounding local community.
This research focus to do evaluation and optimization for selling electricity
PLTH Pantai Baru using Benefit Cost Ratio analysis and HOMER software. The
variables of evaluation and optimization PLTH Pantai Baru are maximum capacity
shortage, hourly loads, solar power output, cost of energy and net present cost.
The results of the study show that section with load 346 kWh/d, would
produced 20 % of power need by the load, with the PV produced 20491 kWh/year
and wind turbine produced 8184 kWh/year . The optimization result with a low net
present cost and low cost of energy is the configuration PLTH 3 with PV power
136610 kWh/year and is also visible to sell electricty. |
---|