EVALUASI FONDASI BORE PILE YANG TIDAK MEMENUHI DAYA DUKUNG RENCANA PADA PROYEK GRAHA INDOLAND

Foundation serves to hold the load acting on it, the above construction loads to the ground layer as possible. In planning the foundation must be done carefully, including supporting the maximum load that occurs. The purpose of this study was to evaluate the bore pile foundation bearing capacity doe...

Full description

Saved in:
Bibliographic Details
Main Authors: , HARYO WAHYU HAPSORO, , Ir. Heru Budi Utomo, MT
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/132435/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72969
Tags: Add Tag
No Tags, Be the first to tag this record!