EVALUASI FONDASI BORE PILE YANG TIDAK MEMENUHI DAYA DUKUNG RENCANA PADA PROYEK GRAHA INDOLAND

Foundation serves to hold the load acting on it, the above construction loads to the ground layer as possible. In planning the foundation must be done carefully, including supporting the maximum load that occurs. The purpose of this study was to evaluate the bore pile foundation bearing capacity doe...

全面介紹

Saved in:
書目詳細資料
Main Authors: , HARYO WAHYU HAPSORO, , Ir. Heru Budi Utomo, MT
格式: Theses and Dissertations NonPeerReviewed
出版: [Yogyakarta] : Universitas Gadjah Mada 2014
主題:
ETD
在線閱讀:https://repository.ugm.ac.id/132435/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72969
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
實物特徵
總結:Foundation serves to hold the load acting on it, the above construction loads to the ground layer as possible. In planning the foundation must be done carefully, including supporting the maximum load that occurs. The purpose of this study was to evaluate the bore pile foundation bearing capacity does not meet the plan. The methodology used to analyze the carrying capacity of the pile is by SPT soil test. Analysis using poulus and davis (1980), where results count for one point bore pole coupled with hydraulic pile is equal to 393 tons, and capable of withstanding a load of 300 tons of plans for a foundation point. So to increase the carrying capacity of the foundation of the need for good planning taking into account the efficiency of time, labor, and expense. So the process of implementation of the work goes well.