EVALUASI FONDASI BORE PILE YANG TIDAK MEMENUHI DAYA DUKUNG RENCANA PADA PROYEK GRAHA INDOLAND

Foundation serves to hold the load acting on it, the above construction loads to the ground layer as possible. In planning the foundation must be done carefully, including supporting the maximum load that occurs. The purpose of this study was to evaluate the bore pile foundation bearing capacity doe...

Full description

Saved in:
Bibliographic Details
Main Authors: , HARYO WAHYU HAPSORO, , Ir. Heru Budi Utomo, MT
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/132435/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72969
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
Description
Summary:Foundation serves to hold the load acting on it, the above construction loads to the ground layer as possible. In planning the foundation must be done carefully, including supporting the maximum load that occurs. The purpose of this study was to evaluate the bore pile foundation bearing capacity does not meet the plan. The methodology used to analyze the carrying capacity of the pile is by SPT soil test. Analysis using poulus and davis (1980), where results count for one point bore pole coupled with hydraulic pile is equal to 393 tons, and capable of withstanding a load of 300 tons of plans for a foundation point. So to increase the carrying capacity of the foundation of the need for good planning taking into account the efficiency of time, labor, and expense. So the process of implementation of the work goes well.