METODE PELAKSANAAN PEKERJAAN CORE WALL PT. PEMBANGUNAN PROYEK APARTEMEN SKYLAND CITY ROSE IN SPRING JATINANGOR PP (PERSERO) Tbk. - CABANG IV
In the process, there are so many methods to maintain the stability of high rise buildings especially in resisting the lateral loads that have sigfinicant effects on it. Several systems are introduced to maintain the stability og high rise building including a shear wall structure and core wall. The...
Saved in:
Main Authors: | , DONY AZHARI, , Devi Oktaviana Latif, ST, M.Eng. |
---|---|
格式: | Theses and Dissertations NonPeerReviewed |
出版: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
主題: | |
在線閱讀: | https://repository.ugm.ac.id/132400/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72933 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
PELAKSANAAN STRUKTUR PADA PROYEK APARTEMENT SKYLAND CITY JATINANGOR DENGAN METODE
KONVENSIONAL DI PT. PP (Persero)Tbk.
由: , RODDY M BARINGBING, et al.
出版: (2014) -
ANALISIS DAN PERENCANAAN TANGGA PROYEK SKYLAND CITY � JATINANGOR, SUMEDANG
由: , ILYAS ZAINUL BAHAR, et al.
出版: (2014) -
Philippine Skylanders, Inc.
由: Lee, Sharee Jean B.
出版: (2001) -
Baguio Baedeker: The Skyland of the Philippines
由: Lambrecht, Francis
出版: (1955) -
THE NORTH STRING @ SEMBAWANG: A SKYLAND THESIS
由: LIN YINYAN ALVIN
出版: (2014)