PERBANDINGAN METODE KERJA ANTARA MESIN CONCRETE PAVER DAN MESIN WACKER PADA MAINROAD LAJUR KIRI SEKSI 1A PROYEK JALAN TOL SURABAYA - MOJOKERTO
Freeway is public road thas is part of system as a network of roads and national road users are required to pay. Operation of freeway is intended to achieve equitable development and the outcome as well as the balance in regional development with due regard, so that can be achieved by building freew...
Saved in:
Main Authors: | , MUSTOFA AGUNG S, , Ir. Heru Budi Utomo, MT. |
---|---|
格式: | Theses and Dissertations NonPeerReviewed |
出版: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
主題: | |
在線閱讀: | https://repository.ugm.ac.id/132006/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72521 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
QUALITY CONTROL DAN METODE KERJA INTEGRAL BRIDGE SECTION P53-P87 PROYEK PEMBANGUNAN JALAN TOL SURABAYA - MOJOKERTO SEKSI IB
由: , ANDITHASARI P., et al.
出版: (2014) -
PENGENDALIAN MUTU DENGAN METODE Q-PASS PEMBANGUNAN JALAN TOL SURABAYA-MOJOKERTO (SEKSI I-B)
由: , IWAN SETYO WIBISONO, et al.
出版: (2014) -
METODE PELAKSANAAN JEMBATAN UNDERPASS KERETA API BEBEKAN DAN ANALISA KAPASITAS DUKUNG TIANG DENGAN METODE SPT PROYEK PEMBANGUNAN JALAN TOL SURABAYA-MOJOKERTO SEKSI IB
由: , LILIK FAJAR P, et al.
出版: (2014) -
Analisis keuangan terhadap kelayakan investasi jalan tol Semarang seksi C (Jangli-Kaligawe)
由: , SOSIAWAN, Andi, et al.
出版: (1999) -
Strategi pelaksanaan proyek pembangunan jalan tol pada lahan yang belum bebas :: Studi kasus pada kontraktor di proyek jalan tol Cinere Jagorawi Jakarta dan proyek jalan tol Waru Juanda Surabaya
由: , INDRARTO, Dono, et al.
出版: (2009)